Courses > Other Electrical > Wind Farm HV Cable Termination (WTCT)
Wind Farm HV Cable Termination (WTCT)
This wind farm HV cable termination course is based on a type of cable termination generally used in the wind farm industry by most major contractors. It also provides candidates with knowledge on how a cable is constructed and the function(s) of the individual components.
Course content
- Cable preparation
- Stress control
- Cable terminations
- Earthing
- Termination failures
- Cable testing
- Cable introduction & regulations
- Cable construction
- Practicals:
- Cable preparation
- Installing 12kv indoor termination for screened single core insulated cable (Heat shrink)
- Installing 24kv indoor termination for screened single core insulated cable (Cold shrink)
- Installing 24kv Pfisterer separable screen T connector
Who should attend?
Electrical engineers/technicians responsible for carrying out or supervising high voltage terminating or jointing.
Please note: Candidates must be competent in the use of hand tools.
Certifications
Candidates who successfully complete the course and both theoretical and practical assessments will receive The Faraday Centre competence certificate. Candidates who fail will receive The Faraday Centre attendance certificate.
Electrical engineers/technicians responsible for carrying out or supervising high voltage terminating or jointing.
Please note: Candidates must be competent in the use of hand tools.